Automatic Door Installation in Red Deer AB | Limitless Doors
Automatic door installation · Red Deer

Automatic Door Installation in Red Deer

In Red Deer, a new automatic entrance on the outside of a commercial building needs two City approvals before anyone cuts the opening. We line those up, then supply, install and commission the door.

Call our Calgary team403-650-5232
Request a quote
Name
5–7 days
Usual City of Red Deer review time for a development permit, which has to be issued before the building permitSource: City of Red Deer, Renovations and alterations

Two permits, in a set order

Changing an exterior door on a commercial or industrial building in Red Deer usually takes a development permit and a building permit. The City won't issue the building permit until the development permit is in hand, so the order matters when you're working to an opening date.

Applications start in the City's MyPermits system, and plans are uploaded through ProjectDox. We give you the door, frame, operator and hardware details for that package, and schedule the install for after the permit is issued.

How an install runs

  1. Site visit

    We measure the opening and check the header, the floor, the power supply and how the entrance is used through the day.

  2. Pick the entrance

    Bi-parting or single slide, a swing operator, or a low-energy opener on a door you already have.

  3. Permit package

    Door and hardware details for MyPermits and ProjectDox, plus a Letter of Authorization if a tenant is applying.

  4. Install and wire

    Frame, header and operator go in, then sensors, push buttons, electric locking and any card reader.

  5. Commission

    We set speeds and safety zones, put the signs up and show your staff the daily check.

Red Deer details that affect the schedule

City rules and local areas we plan around.

Slower in building season

The City warns that permit processing can take longer from April 1 to October 31, when most construction happens.

City of Red Deer, Renovations and alterations

Inspections named on the permit

A Safety Codes Officer decides during review which inspections a job needs and lists them on the approved building permit. Results arrive by email.

City of Red Deer, Renovations and alterations

Six business and industrial parks

Red Deer's commercial work is spread across Chiles, Edgar, Northlands, Queens Business Park, and the Riverside Light and Heavy Industrial parks.

Red Deer, Alberta, Wikipedia

What we install in Red Deer

Adding an automatic entrance in Red Deer?

Tell us the address and your target opening date, and we'll work back from it.

FAQ

Common questions

Still unsure? Call Calgary at 403-650-5232.

Who applies for the permit, us or you?

Usually the owner, tenant or general contractor applies, because they hold the overall project. We supply the door and hardware information the City asks for. If a tenant applies, the City needs a Letter of Authorization from the owner.

Can you install in a building that stays open?

Yes. Most of the work happens with the old door still in place or a temporary door set up, and we plan the switch-over for a quiet time of day.

Is the new door covered after install?

Each door gets a service record. A preventative maintenance plan adds the yearly AAADM inspection and seasonal tune-ups, if you want them handled for you.